The keys change hands, the removal van is booked, and you finally walk through the front door of a home that is entirely yours. Everything looks finished. The paint is fresh, the kitchen gleams, and the hallway smells of new carpet. Then you flick a light switch in the back bedroom and nothing happens, and a bathroom tile has a gap wide enough to catch a fingernail.
That moment is what snagging is for. A snag is a small defect, a fault or an unfinished job that the builder should put right. Most are cosmetic. Some are not. A methodical walk through the property, done before you move in or as soon as possible after, turns a vague sense of unease into a written list the developer has to answer.
What snagging actually covers
Snagging sits between the builder's handover and your first months in the house. It is not the same as a full structural survey, and it does not replace one if you are buying an older property. It concentrates on finish and workmanship: doors that catch on the frame, sockets that sit slightly proud of the wall, plaster that cracks along a join, and silicone that has not been pressed into a clean line around the bath.
Think of it as a practical inspection of what the builder was paid to deliver. Because the list is specific, a site manager can act on it. A general complaint that the place feels rushed is far easier to dismiss.
Work through the house in a sensible order
The temptation is to start in the kitchen, because that is where you will spend most of your time. Resist it. Work from the outside in so that you do not trample fresh decoration before you have checked it, and use the same route every time you return so that nothing gets missed.
- Start outside with the gutters, downpipes, fencing, paths and drainage around the building.
- Look at the roof from the ground, using binoculars where you can, and note any slipped tiles or flashing that looks loose.
- Walk through the front door and test every window, lock and handle before you touch the walls.
- Go room by room from the top floor downwards, testing light switches, sockets, radiators and taps as you go.
- Finish with the kitchen and bathrooms, where water and joins hide the most expensive problems.
Where the defects hide
Experienced snaggers look behind things. Open every cupboard and pull out the drawers, because a misaligned runner is easy to miss when the unit is empty and obvious once it is full. Check inside the airing cupboard, look at the back of the bathroom panel, and inspect the space under the kitchen sink. Look up at the ceiling corners for water staining, and feel the shower tray for a fall that drains toward the waste rather than pooling in the middle.
A torch is worth more than any tool you could buy. Shine it across the walls at a low angle and the bumps in the plaster jump out. Run a hand along the skirting boards, around the door frames and along the top of the stairs, where a rough edge is easy to feel and hard to see.
Bring a second pair of eyes
Bring a friend who has no stake in the kitchen.
You are emotionally invested on completion day. You want the house to be fine, and that makes it easy to overlook a crooked architrave or a socket that sits a touch too far out. A second person will often spot the faults you have talked yourself out of.
If you can, pay for an independent snagging surveyor. Their reports tend to be more detailed than a developer's walk-around, and the list carries more weight when it comes from someone who does not work for the builder. Ask for a sample report before you book, and check that it includes photographs and a clear priority for each item. We recommend the independent route on any new build where the price is high, even if your own checklist feels thorough.
Writing the list so it gets fixed
A defect described vaguely will be deferred. Every item needs four things: the room, the exact location, a plain description and a photograph. A line such as "bathroom: silicone gap along the left side of the bath, wide enough to see the tile backing" gives a contractor everything they need to arrive with the right materials.
- Name the room and the exact spot, such as the join beside the left-hand door frame.
- Describe what you see and what you expect, without guessing at the cause.
- Attach a photograph, with a coin or a tape measure in shot where scale matters.
- Mark anything that affects safety, water or the structure as urgent, and say why.
Send the list in writing, keep a copy and ask for a reference number. A verbal promise from a site manager is pleasant and forgettable. A written list with a reference is what you return to when the second visit does not happen.
Not everything is a defect
Some marks are normal, and a good list says so. Plaster shrinks slightly as it dries, which often produces hairline cracks in the early months, and new timber flooring can creak as it settles. Fresh paint can look patchy until the light changes. Separating real faults from ordinary settling means the builder cannot dismiss the whole document as nitpicking.
The honest test is whether a fault would stop you living comfortably or would cost money if left alone. A sticking door is worth recording. A hairline crack that does not widen is worth photographing and watching, rather than panicking over.
Kitchens, bathrooms and the wet areas
Water is where a new home does its most expensive damage, so spend the longest time here. Run every tap and watch the waste for a slow drain. Check the seal around the sink, and look underneath for any drip, even a bead that forms slowly and falls. Make sure the isolation valves under the sink and behind the washing machine are reachable, rather than sealed behind a panel that will never come off.
In the bathroom, examine the grout and the silicone around the bath, the basin and the shower screen. Fresh silicone should look smooth and continuous, with no gaps where moisture can get behind it. Run the extractor fan and listen for rattling, then confirm it vents outside rather than into the loft. A fan that discharges into a roof space will cause condensation problems within a single damp season.
Electrics, sockets and heating
Test every socket with a phone charger or a simple plug-in tester. A socket that powers nothing is either unwired or faulty, and both are worth recording. Check that the consumer unit is labelled and accessible, and that each light switches from the right place. Ask whether the heating has been commissioned, and whether the thermostat and radiators work across every room rather than just the ones nearest the boiler.
Do not assume a fault is minor because it is small. A loose socket faceplate is a cosmetic problem, but a socket that sparks when you plug something in needs an electrician, not a note on the list.
Sign-off and the paperwork
Be careful about signing anything that says the work is complete. Read the documents that come with completion, and check whether any warranty or building control certificates are included. Ask your solicitor to confirm exactly what you are receiving, and keep copies of everything, including the photographs from your first walk-through. If a defect appears later and you still have the original list, the conversation is far shorter and far less heated.
Your solicitor is the right person to ask about the paperwork and about any retention or deposit arrangements the developer may have. A snagging surveyor cannot give legal advice, and a site manager cannot waive your rights.
The last thing you check
The thing we always check last is the loft hatch. It is easy to forget, and it is where a poor insulation join or a missing cover tends to show itself. Pull the hatch, climb the first rung of the ladder, and look at the roof timbers and the water tank, if there is one. You will see the house the way the builder saw it, and that is worth a few minutes of dust.